New Hanza territory infrastructure

The first infrastructure works on New Hanza territory were started in 2016, when there was network of streets build, water supply, household sewage, heat supply and power lines build, as well as unique large scale rainwater collection and accumulation system. It implies high capacity pumping station for collection of rainwater and gradual draining of it into city sewage system. The pumping station is capable to prevent large puddles even upon the heaviest rain.

Infrastructure works turned out to be a great challenge for the builders due to geological circumstances and high subsoil waters.